NEWS DETAIL

How to Request a Quote for Custom Rubber Parts: Complete RFQ Guide

Author: Site Editor      Publish Time: 2026-05-25      Origin: Site

What to Include in Your RFQ

A complete RFQ (Request for Quotation) helps suppliers give you accurate pricing. Missing information means inaccurate quotes or long back-and-forth. Here’s what to prepare:

Required Documents

  • 2D drawings (PDF): With dimensions, tolerances (e.g., ±0.05mm), surface finish notes
  • 3D files (STEP / IGES): For complex geometries and volume calculation
  • Material specification: Brand name (e.g., Viton® A, EPDM Buna N) or target performance properties
  • Sample (optional but recommended): Physical sample for direct reference

Operating Conditions — Don’t Skip This

  • Maximum and minimum operating temperature
  • Contact media (oil type, fuel, acid, steam, water, etc.)
  • Working pressure and speed (for dynamic seals)
  • Certifications required (FDA, NSF, IATF, ASTM, etc.)
  • Target market and applicable regulations

What a Rubber Parts Quotation Includes

Line ItemWhat It Means
Mold/Tooling CostOne-time setup cost for the mold. May be amortized into unit price for high-volume orders.
Unit PricePer-piece cost. Decreases as quantity increases.
Sample CostFirst-off samples for approval. Usually includes shipping.
PackagingIndividual bag, tray, or bulk packaging
Lead TimeMold lead time + production lead time
MOQMinimum order quantity per production run

How to Read a Quote Red Flag

Red Flag 1: Unit price too low — may indicate sub-standard materials or missing processes (no curing, no finishing).

Red Flag 2: Mold cost not clearly defined — unclear who owns the mold after the order.

Red Flag 3: No mention of inspection reports — no material cert or dimension report = no quality guarantee.

Typical Lead Times

PhaseStandardExpedited
Drawing review & quote1-2 business daysSame day
Mold manufacturing10-15 business days5-7 business days
Sample production5 business days after mold completion2-3 business days
Mass production15-25 business days after sample approval10-15 business days

Need a Quote?

Send us your drawings, operating conditions, and target quantity. Anlintech responds within 24-48 hours with a detailed quotation.

Contact Us
Contact Us

    *Name
    *Email
    *Tel
    *Message
    *Verify Code